Banner Slideshow


TREES RESIDENCES


Trees Residences is located in one of the most popular residential areas of Quezon City where major thoroughfares and transport hubs are readily accessible. The development is also near the proposed MRT-7, which will connect SM North EDSA to San Jose Del Monte, Bulacan via Quirino Highway.
This multi-tower medium rise development with a modern façade is built on a sprawling 8.3 hectare lot with each tower linked by covered walkways.
Get exclusive access to various modern amenities while having the security and intimacy of a neighborhood setting with SM City Fairview and La Mesa EcoPark near you.

TREES RESIDENCES LOCATION:

Address: Barangay Pasong Putik, Novaliches, Quezon City


- 5 mins away from SM City Fairview
- 14.6 km from QC Memorial Circle – 19 mins
- 28 km from Ayala (EDSA) –38 mins
- 2 mins away from la Mesa


TREES RESIDENCES BUILDING PERSPECTIVE

TREES RESIDENCES BUILDING PERSPECTIVE

TREES RESIDENCES MAIN ENTRANCE

TREES RESIDENCES FUNCTION ROOMS

TREES RESIDENCES GARDEN HALL


TREES RESIDENCES FEATURES



- Direct access to Savemore Supermarket
- Less than 5 mins away from SM Fairview, Robinsons Nova Market and ongoing Ayala Mall
- Commercial Establishments along Quirino Highway
- Right across Caltex and Petron Gas Station




- Exclusive Bikeride Station
- A step away from MRT 7 Station
- 5 minutes away from the main MMDA Transport Terminal and SM Fairview Terminal
- Along main highway, with easy access to the public transportation

Trees Residences Neighborhood


Schools:

•OB Montessori School of St. Anthony
•Our Lady of Fatima University
•Mater Carmeli School

Hospitals:

•Commonwealth Hospital and Medical Center
•San Lorenzo Hospital

Places of Worship:

•Mary the Queen Parish Church
•Ascension of our Lord Parish
•Lagro Presbyterian Church

Commercial Establishments:

•Shakeys
•Caltex and Petron Gas Stations
•Banks – BDO and BPI
•Mercury Drugstores

TREES RESIDENCES TECHNICAL DETAILS

Total Lot area – Residential 83,502 sq.m.
•Total Lot area – Commercial 3,675 sq.m.
•19 Buildings, 7 storeys each
•Total no. of units 7,138 and Parking 1,792
•Phase 1 – 2,094  units – 6  Towers – 524 Parking units
•Phase 2 – 3,104 units – 8 Towers – 776 Parking units
•Phase 3 – 1,940 units  – 5 Towers – 485 Parking units
•Total Parking slots Phase 1- 524 slots (Surface and Ground level Parking)
•Tower 1 – Grd level – 28 slots
•Tower 2 – Grd level – 62 slots
•Tower 3 – Grd level – 61 slots
•Surface/Open parking – 373 slots

Construction Schedule:
•Phase 1 – 6 Towers and Main Amenity

Estimated Turnover Dates:
•26 months from start of construction
•Main Amenity – March 2016

PROJECT FEATURES
•1 Elevator and 3 access stairs per Tower
•2 Entrance Gates
•24/7 Security
•CCTV for Central Lobby, Entrances, Perimeter fence and Amenity Area
•Automatic Fire sprinkler system
•Stand-by generator set for common areas, 1 outlet inside the unit
•Fire Exits
•Centralized cistern tank
•Sewer Treatment Plant
•Cable/Telephone ready units

TREES RESIDENCES AMENITIES


  • Swimming Pools
  • Function Rooms
  • Multi-purpose Court
  • Main Lobby
  • Car and Motorcycle Parking


TREES RESIDENCES SITE DEVELOPMENT PLAN







TREES RESIDENCES FLOOR PLAN

TREES RESIDENCES TOWER 1: SECOND FLOOR PLAN 

TREES RESIDENCES TOWER 1: 3rd - 7th FLOOR PLAN 

TREES RESIDENCES TOWER 2: SECOND FLOOR PLAN 

TREES RESIDENCES TOWER 3: SECOND FLOOR PLAN 

TREES RESIDENCES TOWER 3: 3rd - 7th FLOOR PLAN 
TREES RESIDENCES TOWER 5: GROUND FLOOR PLAN

TREES RESIDENCES TOWER 5: 2nd FLOOR PLAN 

TREES RESIDENCES TOWER 5: 3rd FLOOR PLAN

TREES RESIDENCES TOWER 6: GROUND FLOOR PLAN 

TREES RESIDENCES TOWER 6: SECOND FLOOR PLAN

TREES RESIDENCES TOWER 6: 3rd -7th FLOOR PLAN 

TREES RESIDENCES TOWER 7: GROUND FLOOR PLAN 

TREES RESIDENCES TOWER 7: SECOND FLOOR PLAN 

TREES RESIDENCES TOWER 7: 3rd - 7th FLOOR PLAN 


TREES RESIDENCES UNIT LAYOUT

TREES RESIDENCES UNIT TYPES AND LAYOUT
TREES RESIDENCES STUDIO UNIT


TREES RESIDENCES 1 BEDROOM UNIT



TREES RESIDENCES 1 BEDROOM UNIT WITH DEN

TREES RESIDENCES 2 BEDROOM UNIT


TREES RESIDENCES UNIT FEATURES

LIVING AREA
  • WALL FINISHES » Painted Cement Finish
  • DOORS & HARDWARES » Main Door › Solid Panel Door
  • FLOOR FINISH » Vinyl tiles
  • CEILING FINISH » Painted Cement Finish
  • FIXTURES » Lighting Fixtures › by Unit Owner
KITCHEN AND DINING AREA
  • WALL FINISHES » Painted Cement Finish
  • FLOOR FINISH » Vinyl tiles
  • CEILING FINISH » Painted Cement Finish
  • FIXTURES
    •  Lighting Fixtures › by Unit Owner
    • Kitchen counter top will be concrete slab
      with ceramic tile finish only
    • Kitchen sink, base cabinet & faucet
BEDROOM
  • WALL FINISHES » Painted Cement Finish
  • WINDOWS » Powder coated aluminum frame fixed
    window with awning
  • DOORS & HARDWARES » Flush Hollow Core pocket sliding door/regular door, as per layout
  • PARTITION » 2.40 meter Flush partition
  • FLOOR FINISH » Vinyl tiles
  • CEILING FINISH » Painted Cement Finish
  • FIXTURES
    • Lighting Fixtures › by Unit Owner
    • Air Conditioning › by Unit Owner
TOILET AND BATH
  • WALL FINISHES » Semi-Glazed Wall Tiles up to 1.20m High @ shower Area; 1 layer tile baseboard at Water Closet & lavatory Area
  • DOORS & HARDWARES » PVC door
  • FLOOR FINISH » Semi-Glazed Floor Tiles
  • CEILING FINISH » Painted Ficem board
  • PLUMBING FIXTURES
    • Ceramic Water Closet
    • Ceramic Lavatory with faucet
    • Shower set
    • Exhaust Fan
  •  


For more Information, Free Consultation and Showroom or Site Tripping, please contact:


ROXANNE "Roxy" SANTOS
SMDC - IN-HOUSE PROPERTY SPECIALIST
Mobile Number:    +63 917 846 1308
                            +63 939 927 8323
Email Address:    roxy.smland@yahoo.com 

     

1 comment:

  1. I went over this website and I believe you have a lot of wonderful information, saved to my bookmarks garden residences

    ReplyDelete